project 01 · EV infrastructure
National rollout of an EV charging network
Field deployment and central platform
- Context
- A group running electric-vehicle charging infrastructure across Romania.
- What I did
- Site deployment of charging stations, lifecycle management of locations and chargers from the central platform, go-live, and close coordination with the customer app team.
- Result
- Result: [to be completed]
project 02 · OT / SCADA
Network security for a process SCADA in a silo terminal
IT/OT zones, fibre backbone, cutover
- Context
- A port silo terminal with newly commissioned process SCADA automation.
- What I did
- IEC 62443 IT/OT zones and firewall conduits, with RBAC and logging; a fibre backbone into the campus LAN with an IP plan, VLANs, QoS and RSTP redundancy; cutover with minimal process downtime; monitored remote access.
- Result
- Result: [to be completed]
project 03 · industrial Wi-Fi
Industrial Wi-Fi in a port terminal
Trucks and yard machines connected to the terminal operating system
- Context
- A port terminal where trucks and yard machines work with the terminal operating system (TOS), and operational communications depend on network availability.
- What I did
- Extended wireless coverage across the existing terminals and four new sites; connected terminal trucks and yard machines to the TOS over industrial Wi-Fi using rugged tablets.
- Result
- Result: [to be completed]
project 04 · utilities
SCADA operations for a utility group
Hosting, telemetry, firewall conduits
- Context
- A utility group with SCADA applications and business-critical infrastructure.
- What I did
- Hosting and operating SCADA applications; control-centre-to-field telemetry over TCP/IP; firewalls administered as OT/IT conduits (access policy, VPN, monitoring); shutdown and restore of infrastructure, network and applications for critical outages and major maintenance.
- Result
- Result: [to be completed]